The Capital Developments' Park Road Condo rises northeast of Yonge and Bloor in Yorkville in Yorkville and makes a strong local impression when the curved, wedge -shaped shape is created over the class. The 28-story condominium of Diamond Schmitt Architects is located in a compact place, which is framed by Church Street, the Collier Street and Park Road. The massing of the tower inspired by the flaxiron reacts to the irregular geometry of the site with a curved southern height and a square east and western front. Urbantoronto last delivered an update in October 2024 when the crane was installed.
At the beginning of this year, the development had reached the northwest view below. The plate cast on the ground floor was cast, with the steel awareness to prepare for columns on the ground floor and shear walls. A slight dust of snow covers the recently formed surface, whereby the crane is being built near the Church Street facade.
At the beginning of this month, which looks south into the Höhenfront Park Road, the construction rose to four floors, including the Mezzanine plate, which is visible on the left of the entrance to the parking garage. There are formwork and circumference edge protection for the upcoming plate on the fifth floor. The narrow footprint of the site is obvious along the east height, while in the distance it is tapered to an even narrower point in the streets of Collier and Church. A self -supporting platform and a gentle platform and the deck system are visible on the far right. In the background on the left, a Bloor West continues its climb with its blue weather protection system, which crowns the soon “superstall” structure.
With a view of the south to a narrow point at which the unique geometry of the location is tapered to a narrow point, where the streets of the colliers and the church streets meet, the yellow support posts support the panels, while the concrete healing for this western end of the building. Behind the fence on the right is the place of a future pop (privately owned in possession of publicly accessible space).
The curvature looks east over the Church Street and reflects the Church Street along the arch of the site. The terrace and perimeter plate formwork on the fourth floor extends further out to prepare for the self-supporting volume. In the meantime, the crane lifts the materials, while vertical progress continues.
The comprehensive curvature of the southern height towards Eastern Front ends from Church Street and the Park Road. On this page, concrete columns and walls were poured for the fifth floor, with the plate decks and the circumference formwork now progress for level six. On the right side we see more extended decks to prepare for the self -supporting volume that is projected on the fifth floor, with two other booms planned on the eighth and eleventh floor.
After completing the 97.43 M-Tall, 303 residential units are housed behind a facade of windows that are framed in prefabricated metal panels. These are emphasized by metal fins and spandrel glazing, which frames the silhouette of the tower, while the translucent Juliette -Balkon -Wachen open every suite for the city.
Urbantoronto will continue to pursue progress in this development. In the meantime, however, you can find out more about this from our database file linked below. If you want, you can join the conversation in the associated project forum thread or leave a comment in the room provided on this page.
* * *
Urbantoronto has a research service, UtPro, which delivers comprehensive data on development projects in the Greater Golden Horseshoe – from the proposal to completion. We also offer immediate reports, downloadable snapshots based on the location, and a daily subscription newsletter, New Development Insider, which pursues projects from the first application.